Volltext verfügbar nach Anmeldung bzw. im Campus-Netz.
Kazanorgsintez aims to finish building power plant abandoned by Siemens by 2026.
In: Russia & CIS Energy Newswire, 2023-11-13, S. 1-1
Online
Zeitungsartikel
Zugriff:
KAZAN. Nov 13 (Interfax) - Kazanorgsintez (MOEX: KZOS), a division of Russian petrochemical group SIBUR, plans to put a 250 MW combined cycle power plant that was supposed to be built by Germany's Siemens into operation at the end of 2025, the chemical plant's general director, Airat Safin told Interfax at a business forum in Kazan. [ABSTRACT FROM PUBLISHER]
Copyright of Russia & CIS Energy Newswire is the property of Interfax-America Inc. and its content may not be copied or emailed to multiple sites or posted to a listserv without the copyright holder's express written permission. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.)
Titel: |
Kazanorgsintez aims to finish building power plant abandoned by Siemens by 2026.
|
---|---|
Autor/in / Beteiligte Person: | Interfax |
Zeitschrift: | Russia & CIS Energy Newswire, 2023-11-13, S. 1-1 |
Veröffentlichung: | 2023 |
Medientyp: | Zeitungsartikel |
Sonstiges: |
|