Seattle design/build project helps lower costs.
In: WaterWorld, Jg. 15 (1999-06-01), Heft 6, S. 14-14
serialPeriodical
Zugriff:
Focuses on the design/build/operate (DBO) procurement process used by the Seattle Public Utilities (SPU). Cost-saving feature of the process compared to the traditional approach for water treatment plant projects; Contracts negotiated in by SPU which resulted in cost-savings due to the use of the DBO process.
Titel: |
Seattle design/build project helps lower costs.
|
---|---|
Zeitschrift: | WaterWorld, Jg. 15 (1999-06-01), Heft 6, S. 14-14 |
Veröffentlichung: | 1999 |
Medientyp: | serialPeriodical |
ISSN: | 1083-0723 (print) |
Schlagwort: |
|
Sonstiges: |
|