Work plan, health and safety plan, and quality assurance project plan for hazardous waste removal at the CTF K-1654B underground collection tank
In: Other Information: PBD: Oct 1991, 1991
report
Zugriff:
The Central Training Facility (CTF), located on Bear Creek Road approximately two miles south of the K-25 Site, is utilized for training security personnel at Martin Marietta Energy Systems, Inc., Oak Ridge, Tennessee. At the request of the CTF staff, this plan has been developed for the removal of the waste contents in the facility`s 500-gal septic tank and associated distribution box. The septic tank and distribution box were historically located beneath the K-1654B trailer and adjacent to the K-1654A Indoor Firing Range. Recently, however, the K-1654B trailer was removed to accommodate the objectives of this work plan as well as future construction activities planned at CTF. The purpose of this plan is to develop and assign responsibilities, establish personnel protection requirements and mandatory safety procedures, and provide for contingencies that may arise while operations are being conducted by ORNL/MAD at the CTF K-1654B underground collection tank site. This document addresses requirements of 29 CFR 1910.120, Final Rule, with respect to aspects of health and safety applicable to an underground collection tank waste removal.
Titel: |
Work plan, health and safety plan, and quality assurance project plan for hazardous waste removal at the CTF K-1654B underground collection tank
|
---|---|
Autor/in / Beteiligte Person: | Panter, M. S. ; Burman, S. N. ; Landguth, D. C. ; Uziel, M. S. ; United States. Department of Energy. |
Link: | |
Zeitschrift: | Other Information: PBD: Oct 1991, 1991 |
Veröffentlichung: | Oak Ridge National Laboratory, 1991 |
Medientyp: | report |
DOI: | 10.2172/10107318 |