Execution Of Following Civil Engineering Works 1. Construction Of Additional Water Ways Of Boulder Drain Bridge By Providing Rcc Box Size 1.5 X 1.5 M By Cut And Cover At Bridge 161 Between Slpm-txd And 2. Construction Of Additional Water Way At Boulder Dr.
In: Mena Report, 2024-03-02
Online
Zeitungsartikel
Zugriff:
Titel: |
Execution Of Following Civil Engineering Works 1. Construction Of Additional Water Ways Of Boulder Drain Bridge By Providing Rcc Box Size 1.5 X 1.5 M By Cut And Cover At Bridge 161 Between Slpm-txd And 2. Construction Of Additional Water Way At Boulder Dr.
|
---|---|
Link: | |
Zeitschrift: | Mena Report, 2024-03-02 |
Veröffentlichung: | 2024 |
Medientyp: | Zeitungsartikel |
ISSN: | 2219-0112 (print) |
Sonstiges: |
|