A Nanogrid (NG) model is described as a power distribution system that integrates Hybrid Renewable Energy Sources (HRESs) and Energy Storage Systems (ESSs) into the primary grid. However, this process is affected by several factors, like load variability, market pricing, and the intermittent nature of Wind Turbines (WTs) and Photovoltaic (PV) systems. Hence, other researchers in the past have used a few optimization-based processes to improve the development of Energy Management Systems (EMSs) and ESSs, which further enhanced the operational performance of NGs. It was seen that EMS acts as the distributed energy source in the NG setup and assists in power generation, usage, dissemination, and differential pricing. Hence this study employed the MATLAB Simulink software for modelling the grid-connected NG that included HRES; such as wind and PV; in addition to 3 Battery Storage Devices (BSDs) to design an effective EMS for the NG system and decrease its overall costs. For this purpose, a Rule-Based EMS (RB-EMS) that employs State Flow (SF) to guarantee a safe and reliable operating power flow to the NG has been developed. In addition to that, a Genetic Algorithm (GA)-based optimization system and Simulated Annealing optimization Algorithm (SAA) were proposed to determine an economical solution for decreasing the cost of the NG system depending on its operational constraints. Lastly, comparison about the cost between RB-EMS, GA and SAA has been presented. According to the simulation results, the proposed GA displayed an economical performance since it could achieve a 40% cost saving whereas the SAA system showed a 19.3% cost saving compared to the RB-EMS. It can be concluded from the findings that the GA-based optimization technique was very cost-effective displays many important features, like rapid convergence, simple design, and very few controlling factors.
Keywords: Energy management system; Genetic algorithm; Renewable energy sources; Battery storage
A power distribution setup that can assimilate multiple distributed sources, like renewable energy sources (RESs), energy storage systems (ESSs), and non-RES, is known as a microgrid (MG) or nanogrid (NG). The power pyramid is what primarily distinguishes MG from NG. For example, NG is usually less complex and less powerful than MG. While MG can provide numerous entities, such as institutions of higher learning and medical and industrial facilities, with over tens of MWs, NG can provide a modest structure or a home with a power output exceeding tens of KWs[
An energy management system (EMS) is described as a control mechanism that provides the necessary functionality and information to ensure that both the generation units and distribution setups produce electricity at the lowest possible operational costs in NG and MG applications[
With the integration of RESs, NGs and MGs play a significant role in enhancing the electrical grid and moving away from sources of pollution. NG and MG systems use a variety of RESs, including solar photovoltaic (PV) and wind turbine (WT) systems. However, as PV and WT systems are intermittent in nature, an ESS consisting of supercapacitors or batteries can be used to sustain the power generated by such RES setups[
An NG is a unit that can be programmed to swiftly respond to the various load needs of local areas to increase the dependability of the supplied power, provide uninterrupted power supply, and decrease distribution losses. This can be accomplished using the NG's power conversion system[
Multiple recent studies have examined how NG and MG systems function. A few optimization techniques have been used to identify the most effective operation schedules for various loading scenarios and objectives. One of the biggest issues that existing optimization methods face is the selection of the most cost-effective units to use[
In[
In[
Another study proposed a grid-connected MG EMS with solar and BSD to reduce an MG's COE. Heuristic and optimization strategies for clear and foggy days were both considered. The simulation outcomes revealed that the optimization approach decreased the COE by 6.6% on clear days and 13.7% on overcast days than heuristics[
A teacher-learning-based optimization (TLBO) was used to overcome the non-linear energy management issues and decrease the operating cost of a grid-connected MG composed of a WT, a PV, a FC, a MT, and a BSD. The simulation findings showed that the suggested method could perform a global search, resulting in quick and acceptable convergence, while the experimental findings demonstrated its superiority and viability over other prominent methods[
In[
In[
In[
In[
A hierarchical control architecture is necessary to regulate NGs. This hierarchy has three control levels; namely, primary, secondary, and tertiary. Local voltage, frequency, and current are controlled at the primary control level or power management system (PMS) level[
The EMS or secondary control level manages and regulates the power flow between the generation sources, the primary grid, and the internal load needs of the NG system[
The research objectives were split into three steps. The first step was to model the grid-connected NG using MATLAB Simulink, which included a WT and PV hybrid RES dual active bridge (DAB) DC/DC converters, a BSD, LCL filters, DC/AC inverters, and the variable load for one day. In the second step, a rule-based EMS using an SF approach for an NG system to ensure power flow and a safe and dependable operation was recommended. The third stage involves applying an optimization technique based on a genetic algorithm (GA) for an NG system to find the most economical solution for distributed generation units. To showcase the effectiveness of the recommended algorithm, the performance of GA is compared to that of the Simulated Annealing optimization algorithm (SAA). Figure 1 depicts the frameworks of all the procedures used to determine the most advantageous and cost-effective solutions for grid connected NGs. The primary contributions of this paper are summarised below:
- Designed the NG-connected modelled grid using the MATLAB Simulink software and proposed RB-EMS for guaranteeing a safe and reliable operating power flow in the NG system.
- Analysis of the single-objective optimization issue after decreasing the overall operational costs.
- GA has been introduced for resolving the single-objective optimization issue.
- GA displays many important features, like rapid convergence, simple design, and very few controlling factors.
- The simulation results were compared with the SAA optimization findings.
- Finally, the effectiveness and robustness of the proposed GA in the single-objective optimization setting were validated.
Graph: Figure 1RB-EMS and GA based on grid connected NG.
The paper is structured as follows: Section "Introduction" introduces MG and NG energy management. Section "Nanogrid (NG) system explanation" gives a comprehensive description of the NG system with RB-EMS. Section "Formulation of optimization problem" describes the optimization problem, objective function, limitations, and GA execution. Section "Simulation results and discussions" presents the outcomes and discussion. The conclusions are presented in Section "Conclusions".
As seen in Fig. 2, the grid-connected NG comprised a PV array, a BSD, a WT system, a DC/DC boost converter, DAB converters, LCL filters, and DC/AC inverters, along with three-phase loads modelled in MATLAB Simulink software coupled with local controllers.
Graph: Figure 2Nanogrid (NG) modeling.
Maximum power point tracking (MPPT) extracted energy from the PV array while the BSD created energy balance in the NG structure. The WT system, which was a critical component, was designed using a permanent magnet synchronous generator (PMSG).
The array, which was simulated in MATLAB, comprised 14 series-connected PV panels and four parallel connections. The parameters of the PV panels were set as maximum current output (I
Figure 3 depicts the power characteristics of the PV system using Malaysian irradiation data for 24 h at 25 °C. The peak power production was 16.7 kW. Figure 4 depicts the single-day irradiation information. The perturb and observe (P&O) technique was used to drive the MPPT to extract power from the PV array[
Graph: Figure 3The PV array power curve for one day.
Graph: Figure 4The PV irradiation data for one day.
The equation below was used to compute the highest current output of the PV array
1
Graph
where, V
The WT system comprised a PMSG-based WT, a DC/DC boost converter, a DC converter, a DC/AC inverter, and a controller. The wind-based power computation is, subsequently, discussed.
2
Graph
where, P
A variable-speed WT system was employed for 24 h. Figure 5 indicates single-day power characteristics with a 15-kW peak. Moreover, Fig. 6 indicates single-day wind speed information.
Graph: Figure 5The power curve of wind for one day.
Graph: Figure 6The wind speed data for one day.
It was critical to connect a BSD to the grid-linked system due to the uncertain power generation of PV and WT sources. The BSD comprised three lithium-ion batteries that had several desirable characteristics; such as high energy density, high performance, superior life cycle (1000 cycles), and low power duration (within 1 h)[
The BSD charging and discharging states depended on the state of charge (SOC), the WT's available power, and the PV's available power. The SOC thresholds determine the amount of energy drawn from the BSD.
3
Graph
where, SOC_MIN and SOC_MAX are the lower and the upper limits of the SOC of the BSD, respectively. Table 1 provides the parameters of the BSD.
Table 1 The battery storage parameters.
Parameters Values Operating voltage range 42–54 V Nominal voltage 48 V Rated capacity 100 Ah Initial SOC 40% SOC_MAX 80% SOC_MIN 20%
As a DC/DC boost converter is a very efficient transformer-less device that steps up the input voltage, it is frequently used in WT and PV installations[
Table 2 The DC/DC boost converter parameters.
Parameters Values of PV side converter Values of wind side converter Converter switching frequency (fsw_boost) 25 kHz 25 kHz Inductance (L) 1.53 × 103 H 1.53 × 103 H Input capacitor (Cin) 100 × 106 F 100 × 106 F Output capacitor (Cout) 1 × 103 F 1 × 103 F
Table 3 The DC/DC DAB converter parameters.
Parameters Values Input capacitance (Cin) 2000 × 106 F Output capacitance (Co) 2000 × 106 F Leakage inductance (L) 6 × 106 H Switching frequency (Fs) 25 kHz Input voltage (Vin) 48 V Output voltage (Vo) 800 V Maximum duty cycle (dMAX) 0.35 Turn ratio of the transformer (n) 5
MG and NG setups critically rely on DC/AC inverters to transform the DC power from PV arrays, WTs, or BSDs to AC power. A more comprehensive analysis was presented in[
LCL filters help eliminate unnecessary harmonics. The technique specified by[
Table 4 The parameters of DC/AC inverter LCL filters.
Parameters Values of PV inverter and LCL filter Values of WT inverter and LCL filter Values of batteries inverter and LCL filter Rated power (Pn) 16.7 kW 15.0 kW 15.0 kW DC voltage ( 800 V 800 V 800 V Grid voltage (Vg) 400 V 400 V 400 V Grid frequency (Fg) 50HZ 50HZ 50HZ Switching frequency (Fsw) 10kHZ 10kHZ 10kHZ Filter capacitor (C) 32.22 µF 32.22 µF 40 µF Inverter-side inductor (L1) 3 mH 3 mH 2.55 mH Grid-side inductor (L2) 0.046 mH 0.046 mH 0.038 mH
The SF technique was modified to suit the RB-EMS approach. This technique comprised an event-specific modelling toolbox in MATLAB to facilitate the logic modelling of the dynamic regulation of the RB-EMS. The power flow regulation is based on the energy availability data of the BSD, WT, PV, and energy demand. It provides control commands to power conversion systems that include the converters and inverters typically used to integrate NG systems.
The RB-EMS was the primary instrument that controlled and regulated the commands in the NG setup and the workings of all the inverters, controllers, and converters while the MPPT drove the DC/DC boost converters connected to the PV and WT systems. The DAB-only converters of the BSD controlled its discharging or charging states to provide a steady DC bus voltage. It was critical to balance the NG power for various power levels from the BSD, the PV, the WT, the grid, and the energy demand. The power balance expression is specified below.
4
Graph
Figure 7 presents a flowchart of the various operation modes of the RB-EMS applied in the SF.
Graph: Figure 7Rule based energy management system (RB-EMS).
The EMS used different modes based on two criteria; namely, power production from the WT and the PV and the SOC of the BSD.
If the power demand exceeded the average power generated by the WT and PV systems, the BSD balanced the deficit until the SOC approached SOC_MIN. The three BSDs discharged equally to balance the power. For instance, if the BSD was powering a 3-kW load, each BSD was loaded at 1 kW. The grid was the last source used to power the balance, which was when the BSDs reached SOC_MIN. The more desirable scenario was the average power generated by the WT and PV system exceeding the load demand. The PV and WT systems powered the load demand and charged the BSD to SOC_MAX. When the SOC_MAX limit was reached, the excess energy was exported to the grid.
This section specifies the optimization problem of this present study. The overall operating cost of the NG was the objective function. The decision variables comprised DG power generation and the grid to provide optimal power production points for every source. ON/OFF states were used to optimize the overall operating cost of the NG and fulfil the restrictions concerning power generation levels, load balance, and BSD charging/discharging.
As reducing the total cost is critical to optimizing NG operations, various objective functions for reducing the cost of NG and MG have been presented in[
5
Graph
6
Graph
7
Graph
8
Graph
9
Graph
10
Graph
11
Graph
12
Graph
13
Graph
where, T is the total time of the study in hours (h);
Three constraints; namely, the load generation balance, the power limit of the generating units, and the charging and discharging of the BSD; were considered.
As load demands must be fulfilled, regardless of the conditions, the NG should be able to adequately fulfil the load demand. This case can be expressed as follows:
14
Graph
where,
The amount of power that the WT, PV, and BSDs can provide are subject to the following limitations:
15
Graph
where, MAX and MIN are the maximum and minimum boundaries of the variable, respectively.
The following expressions specify the charge and discharge limits of the BSD[
16
Graph
17
Graph
where, W
This section provides a comprehensive overview of aspects of the system; such as the energy production of the WT and PV, the load characteristics, and the grid tariffs of the NG setup. All the assumptions discussed in this section were based on real-world data.
As wind velocity and irradiation levels determine the power production of WT and PV systems, they were modelled based on the Malaysian climate. Figures 3 and 5 provide the hourly predicted PV and wind power levels throughout the day, respectively.
Numerous factors; such as geography, hourly time of day, and climate change; affect load demand. Figure 8 provides the random commercial load profile for Malaysia, with time-specific changes in load demand indicated[
Graph: Figure 8Load profile for one day.
The primary grid market price indicates changes in demand while supply pricing facilitates higher production during peak demand and lesser production during lower demand. Figure 9 provides the 24 h electricity price (USD/kWh) profile of the Malaysian national grid[
Graph: Figure 9Malaysian power price for one day.
This section specifies the source-specific power levels, including the LCOE of a DG when it is in operation and the true cost of using a BSD.
Wind turbines (WTs), PV arrays, and BSDs have upper and lower power generation constraints during operation. The International Renewable Energy Agency (IRENA) specifies the LCOE per kWh standards for BSD and RES systems. As the LCOE depends on the country, the data used in this present study pertained to Malaysia. The LCOE typically comprises the installation and O&M cost of a power source. Furthermore, the true cost of using a BSD (USD/kWh) may be computed by amortising its cost (USD135/kWh per IRENA standards) over its usable life. The usable life may be determined by multiplying the cycle life (3000 cycles) and the rated energy content of the BSD (4.8 kWh). Table 5 lists the actual LCOE of PV arrays, WTs, and BSDs based on their usable life as well as upper and lower limits for BSDs and RESs.
Table 5 LCOE and technical coefficient of the DGs sources.
Unit LCOE (USD/kWh) PMIN (kW) PMAX (kW) PV 0.078 0 16.7 Wind 0.039 0 15 Battery 0.045 − 4.8 4.8
This section discusses the optimization algorithm for the power generated by the NG system. The GA was employed to assess the optimization issues of NG operation[
Optimizing using GA offers several benefits over other algorithms, including optimizing with continuous or discrete variables and not requiring derivative information. The GA can also deal with non-linearity issues, whether as constraints or objective functions[
Like all the optimization algorithms, the GA needs the specification of the suggested upper and lower values of the variables that require optimization as they establish the starting point of the decision variables. The steps used to identify the best solutions to the optimization problem are provided below.
The GA aimed to solve the optimization problem by searching for an optimal solution; which was the lowest cost; among the variables of the problem; which were the P
18
Graph
The GA can function with various possible solutions, known as populations. A population can include 30 to 100 chromosomes. A matrix denotes the population within each row of the matrix, which is a 1 × Nvar chromosome of the continuous values. By considering a 24-chromosome preliminary population of Npop, the matrix below describes the full Npop × Nvar matrix of the random values:
Graph
A selection procedure helps determine which parents need to die and which ones must be preserved and allowed to reproduce to maintain a constant population size. Meanwhile, a crossover is the basic operator used to generate new chromosomes in the proposed algorithm. Much like in nature, a crossover can generate new chromosomes that include a few sections of the genetic materials of both parents. A crossover was employed to yield new solutions based on the available existing solutions in the mating group post-use of the selection operator.
A mutation can be defined as a random process that is responsible for searching for the best and most optimal solution. The mutation process begins with selecting the mutation rate and the variables' row while the columns to be mutated are selected based on random numbers. A new random variable then switches a mutated variable based on the variable's limits. The stages of the GA are presented in the flowchart provided in Fig. 10.
Graph: Figure 10The GA stages flowchart.
This present study used RB-EMS, GA and SAA. In the testing phase, the RB-EMS considered the behaviour during the day, the PV-related irradiation data at a constant temperature of 25 °C, the random demand profile, and the wind data speed for one day. The RB-EMS was tested based on the grid that was connected to the NG, which comprised a WT system, a PV array and three BSDs. Both the RESs and BSDs had to supply the load at any given time to ensure constant power flow. The GA optimization and its effect on the overall cost of the NG system was presented. The cost saving efficacy of the RB-EMS was also compared with GA and SAA.
The purpose of the RB-EMS was to satisfy load demands that had reached a peak of 15 KW in various generating conditions and utilising minimum supply from the grid. Figure 11 shows the power at different locations of the NG. The three BSDs supplied the load for up to 8 h as the PV and WT produced zero power. Post 8 h, the PV and WT supplied the load at various intervals while the additional power produced was used to charge the BSD. The excess power was then transferred to the grid for up to 15 h. The BSD supplied the load as the both the PV and WT produced less power between 15 and 18 h. Between 18 and 24 h, the WT supplied the load with support from the BSD. Figure 12 shows the discharging and charging states of the three BSDs during the day while Table 6 lists the total power produced by the WT and PV, the discharging and charging states of the BSD, and the power transferred to the grid over a 24 h period post-using the RB-EMS.
Graph: Figure 11PV, wind, batteries, load, and grid power curves for 1 day.
Graph: Figure 12The batteries charge and discharge curves for 1 day.
Table 6 The power of each source after applying RB-EMS.
Time (h) P_PV (kW) P_WIND (kW) P_BAT1 (kW) P_BAT2 (kW) P_BAT3 (kW) P_GRID (kW) 1 0 0 2.3758 2.3758 2.3758 0.026701 2 0 0 2.2223 2.2223 2.2223 0.19228 3 0 0 2.2025 2.2025 2.2025 0.18756 4 0 0 2.3831 2.3831 2.3831 0.23742 5 0 0 2.3611 2.3611 2.3611 − 0.10344 6 0 0.13385 2.3973 2.3973 2.3973 − 0.064919 7 1.2225 0.21054 2.2913 2.2913 2.2913 − 0.26211 8 5.1682 0.50225 1.7427 1.7427 1.7427 − 0.33055 9 10.771 15.484 − 3.9865 − 3.9865 − 3.9865 − 0.4598 10 13.988 6.2973 − 1.0701 − 1.0701 − 1.0701 − 0.58628 11 15.902 7.632 − 1.5901 − 1.5901 − 1.5901 − 2.3206 12 16.604 1.9984 − 0.18209 − 0.18209 − 0.18209 − 1.0174 13 15.928 1.3477 − 0.10251 − 0.10251 − 0.10251 − 0.16861 14 14.1 4.7813 − 0.72559 − 0.72559 − 0.72559 − 1.3571 15 11.314 1.8135 − 0.0023817 − 0.0023817 − 0.0023817 4.407 16 7.4909 0.49032 2.7134 2.7134 2.7134 1.1682 17 2.9568 8.8299 2.5064 2.5064 2.5064 − 3.7322 18 0.017231 8.1933 2.4362 2.4362 2.4362 − 3.8084 19 0 9.0514 0.70303 0.70303 0.70303 − 1.5764 20 0 8.3478 0.018947 0.018947 0.018947 − 0.2858 21 0 7.6961 0.63583 0.63583 0.63583 − 1.3901 22 0 9.2805 − 0.0070803 − 0.0070803 − 0.0070803 − 0.53016 23 0 0 2.5112 2.5112 2.5112 1.61 24 0 0 2.5604 2.5604 2.5604 1.1341
As seen in Fig. 11, the power outputted by all the sources post-using the RB-EMS was extracted to the workspace and acted as an input for the GA. The optimization problem was solved based on the optimization algorithm, which helped decrease the overall cost of the NG. The daily PV irradiation data and the wind speed data were used to analyse the results. The SOC of the BSD constraints were kept in the range of 20 to 80% SOC, which helps extend battery life. The NG used a lithium-ion battery. As for the GA optimization operation, the time step was set to a 24 h scale. The GA optimization helped decrease the COE from the main grid as well as satisfy the load demand using the power generated by the WT, the PV, the grid, and the BSDs, which, in turn, helped decrease the COE of the grid. Moreover, a comparison with SAA has been presented to showcase the effectiveness of the GA. Table 7 lists the optimum allocation post-using GA for NG generators, BSDs, and the main grid in a 24 h operation scenario, as per the cost function. While Table 8 presents the list of ideal distributions after the use of SAA for the NG generators, BSDs, and the primary grid in the case of a 24 h operation context, based on the cost functions.
Table 7 The power of each source after applying GA.
Time (h) P_PV (kW) P_WIND (kW) P_BAT1 (kW) P_BAT2 (kW) P_BAT3 (kW) P_GRID (kW) 1 0 0 2.3755 2.3756 2.3756 − 2.8362 2 0 0 1.4892 1.487 1.4876 − 0.545 3 0 0 1.4683 1.4686 1.4689 − 0.54673 4 0 0 2.3831 2.3831 2.3821 − 3.1423 5 0 0 2.3593 1.4901 1.3039 − 0.97427 6 0 0.13023 2.3963 2.3973 2.3973 − 2.8279 7 1.2217 0.17252 2.2912 2.2913 2.2913 − 3.7825 8 4.8294 0.20242 1.2833 1.7424 1.2772 − 1.8803 9 0.16613 14.33 − 3.9865 − 3.9865 − 3.9865 − 2.6169 10 11.846 4.1736 − 3.0036 − 1.3087 − 1.1066 − 2.7211 11 15.902 7.6318 − 1.6148 − 1.6176 − 1.6103 − 10.174 12 13.138 1.9984 − 0.19813 − 0.19113 − 3.64 − 1.0185 13 15.928 1.3471 − 1.3969 − 2.1735 − 3.9017 − 3.4506 14 13.141 2.8238 − 1.7352 − 1.2622 − 0.77025 − 3.3162 15 10.138 1.636 − 3.9364 − 2.9847 − 0.052179 3.225 16 7.0509 0.49025 1.834 2.7202 2.2806 0.28731 17 2.5045 8.6287 2.4963 2.3668 2.499 − 5.1482 18 0 7.477 2.4362 2.4448 1.7287 − 5.2426 19 0 9.0514 0.70303 0.69151 0.69151 − 1.5764 20 0 8.3473 0.018947 − 0.013587 − 0.013587 − 2.3032 21 0 7.6961 0.63583 0.61402 0.61402 − 1.3901 22 0 9.2796 − 0.0087762 − 0.85369 − 0.017254 − 2.5806 23 0 0 2.0558 2.0601 2.0629 0.15312 24 0 0 2.4514 1.7367 1.9796 0.15312
Table 8 The power of each source after applying SSA.
Time (h) P_PV (kW) P_WIND (kW) P_BAT1 (kW) P_BAT2 (kW) P_BAT3 (kW) P_GRID (kW) 1 0 0.0024 1.4706 1.2967 1.6039 − 0.0825 2 0 0.0037 1.0081 1.2272 1.7025 − 0.022 3 0 0.0025 1.0798 1.2983 1.3219 0.1573 4 0 0.0136 0.9445 1.483 1.1259 0.4396 5 0 0.0373 1.0007 1.3068 1.6078 0.2256 6 0 0.0183 1.4370 1.6282 1.5106 − 0.2302 7 0.4005 0.2101 0.7925 1.7132 0.9723 0.2251 8 3.0205 0.4011 1.4586 0.9704 1.5059 − 0.1038 9 9.4301 13.4799 − 3.9864 − 3.9864 − 3.9864 − 0.4063 10 12.3936 5.4318 − 1.4786 − 1.3434 − 1.2694 − 0.4339 11 14.3671 6.4831 − 1.8233 − 1.7111 − 2.2557 − 1.7001 12 14.0401 1.6545 − 0.4847 − 0.2702 − 0.4054 − 0.4152 13 13.6151 1.1518 − 0.3674 − 0.1163 − 0.3833 − 0.0747 14 12.1775 3.9105 − 0.729 − 0.7773 − 0.7578 − 1.1737 15 10.8265 1.4049 − 0.2896 − 0.0599 − 0.4653 3.5834 16 6.1777 0.3896 2.2472 2.0062 2.386 0.9671 17 2.7211 8.3008 2.1359 2.3943 1.9599 − 4.1642 18 0 6.357 1.6767 2.2382 1.5252 − 2.9522 19 0 7.8848 0.4429 0.3518 0.2802 − 1.4598 20 0 6.8184 − 0.136 − 0.3759 − 0.1208 − 0.1405 21 0 6.0188 0.4813 0.5396 0.5921 − 1.132 22 0 8.0904 − 0.4505 − 0.4872 − 0.4545 0.0018 23 0 0.6535 1.5094 1.6575 1.6873 0.8239 24 0 0.0827 1.6193 1.7706 1.7304 1.1298
The GA optimization provided an added benefit for almost every measure versus the RB-EMS. The total cost of variable-price electricity was calculated in terms of USD/kWh. The results showed that the COE of RB-EMS was USD 15.9856/day whereas the COEs displayed by the GA and SAA optimization systems were USD 9.50672/day and USD 12.8928/day, respectively. Table 9 presents the COE (per hour) and the daily overall cost savings after employing the RB-EMS and GA systems. Figure 13 displays the COE values shown by the GA and RB-EMS systems. Table 10 displays the COE (per hour) and the daily overall cost savings after employing the RB-EMS and SAA systems; whereas Fig. 14 depicts the COE comparison of both the systems.
Table 9 RB-EMS and GA cost and the saving for one day.
Time (h) Cost after applying RB-EMS (USD) Cost after applying GA (USD) Saving (USD) 1 0.32252 0.13067 0.19185 2 0.3129 0.16435 0.14854 3 0.30991 0.16163 0.14828 4 0.33763 0.11114 0.22649 5 0.31181 0.16662 0.14519 6 0.31929 0.13412 0.18516 7 0.38712 0.15119 0.23593 8 0.61029 0.41049 0.1998 9 1.4049 0.34938 1.0555 10 1.2869 0.8555 0.43136 11 1.2131 0.11355 1.0996 12 1.2866 1.0161 0.27047 13 1.2806 1.0016 0.279 14 1.0963 0.67089 0.42542 15 1.5702 1.3061 0.26415 16 1.1148 0.89776 0.21701 17 0.59643 0.42557 0.17086 18 0.32549 0.14342 0.18207 19 0.21901 0.21901 0 20 0.30127 0.12977 0.1715 21 0.18199 0.18199 0 22 0.32642 0.18901 0.13742 23 0.4473 0.28831 0.15899 24 0.42289 0.28855 0.13434 Total 15.9856 USD/day 9.50672 USD/day 6.47892 USD/day
Graph: Figure 13The cost of RB-EMS and GA for NG system.
Table 10 RB-EMS and SAA cost and the saving for one day.
Time (h) Cost after applying RB-EMS (USD) Cost after applying SAA (USD) Saving (USD) 1 0.32252 0.19118 0.13133 2 0.3129 0.17572 0.13716 3 0.30991 0.17704 0.13286 4 0.33763 0.18937 0.14825 5 0.31181 0.19131 0.12049 6 0.31929 0.19048 0.12879 7 0.38712 0.20284 0.18427 8 0.61029 0.40385 0.20643 9 1.4049 1.22673 0.17817 10 1.2869 1.14166 0.14519 11 1.2131 1.13546 0.07765 12 1.2866 1.12436 0.16224 13 1.2806 1.10054 0.18003 14 1.0963 0.93803 0.15827 15 1.5702 1.40093 0.16927 16 1.1148 0.91604 0.19872 17 0.59643 0.47408 0.12234 18 0.32549 0.24179 0.08368 19 0.21901 0.18342 0.03559 20 0.30127 0.25397 0.04729 21 0.18199 0.13851 0.04348 22 0.32642 0.31565 0.01076 23 0.4473 0.27364 0.17365 24 0.42289 0.30611 0.11677 Total 15.9856 USD/day 12.8928 USD/day 3.0928 USD/day
Graph: Figure 14The cost of RB-EMS and SAA for NG system.
The results presented in Figs. 13 and 14 indicated that with regard to the determination of optimal operating costs, the proposed GA showed a better performance compared to the SAA algorithm. It was noted that the GA acquired a 40% cost saving, while the SAA achieved a 19.3% cost saving compared to the RB-EMS. The primary difference between the optimization algorithms and RB-EMS was that the RB-EMS relied mainly on logic and predefined rules before making decisions regarding the distribution and consumption of energy in the NG systems. These rules were based on the system's knowledge and operational experience. This technique was generally used for guaranteeing power flow in the NG system and for providing safe and reliable functioning.
Meanwhile, optimization algorithms like GA employ mathematical models for determining the cost-effective and efficient ways of managing energy in the NG system. The above algorithms consider different constraints and factors for optimizing energy generation, storage, and energy consumption, for fulfilling objectives like cost minimization.
The benefits of the GA optimization for the NG system can be described as follows: The GA significantly decreases the COE of NG compared to RB-EMS. Moreover, the proposed optimization algorithm also reduced grid energy usage. In future, several advanced algorithms will be used for solving the multi-objective issue that includes minimizing the costs and emissions generated from the NG system.
In this study, an RB-EMS is proposed for the grid-connected NG that included a PV, WT, and BSD. The RB-EMS primarily aimed to offer safe and reliable functioning and guarantee a steady power flow within the NG system. Furthermore, the GA was employed for minimizing the costs of the NG system. In addition to its simplicity, the GA-based optimization technique showed a low computational complexity. The GA technique proposed in this study could effectively overcome the limitations in comparison to the conventional heuristic techniques. This study compared the simulation results presented by the GA, RB-EMS, and SAA optimization techniques; wherein the daily costs for the RB-EMS, SAA, and GA techniques were seen to be USD 15.9856/day, USD 12.8928/day, and USD 9.50672/day respectively. Finally, it was concluded that the GA-based optimization technique was very cost-effective. This technique also lowered the variable-electricity cost by ≈ 40% compared to the RB-EMS and also lowered the grid energy usage. On the other hand, the SAA optimization reduced the costs by ≈ 19.3% compared to the RB-EMS.
This work was supported by the Ministry of Higher Education, Malaysia, through the Fundamental Research Grant Scheme (FRGS), under the project code of FRGS/1/2022/TK08/UNITEN/01/3.
Conceptualization, S.J. and J.P.; resources, S.J. and J.P.; writing original draft preparation, S.J. and J.P.; writing review and editing, S.J., J.P. and J.E.; supervision, J.P.; project administration, J.P.; funding acquisition, J.P. All authors have read and agreed to the published version of the manuscript.
The datasets used and/or analyzed during the current study are available from the corresponding author on reasonable request.
The authors declare no competing interests.