Construction Planning Optimization under Limited Resources with Critical Part Segment
In: Warasan Witthayasat Lae Theknoloyi Mahawitthayalai Mahasarakham, Jg. 38 (2019), Heft 2, S. 217-227
Online
academicJournal
Zugriff:
Appropriate construction planning methods are available using several methods. Each of these approaches has the goal of addressing the different needs of planners. Planning a master resource at a particular partner neglects the impact on other resources that were not considered at that time; the plan was not reasonable. The overall cost of a construction project consists of several factors; labour cost, rental costs of mechanism, interest on loans, fines and opportunity costs. This article develops a planning approach that takes into account factors that will affect project costs. Using the critical part segment (CPS) helps to plan the scheduling of overall resource utilization of the project and other conditions; such as the contract period, number of available resources, work in normal time and overtime, credit limits and restrictions on the relationship between construction activities. Then the developed model was adopted on a basic office program, Microsoft Excel, which can be used to easily find the best answer which can be achieved using a simulation process with genetic algorithms. The result of this study provides models for most effective project planning of resources management and other conditions.
Titel: |
Construction Planning Optimization under Limited Resources with Critical Part Segment
|
---|---|
Autor/in / Beteiligte Person: | Kumtip, Thanin |
Link: | |
Zeitschrift: | Warasan Witthayasat Lae Theknoloyi Mahawitthayalai Mahasarakham, Jg. 38 (2019), Heft 2, S. 217-227 |
Veröffentlichung: | Mahasarakham University, 2019 |
Medientyp: | academicJournal |
ISSN: | 1686-9664 (print) |
Schlagwort: |
|
Sonstiges: |
|