Numerical analysis of hard rock tunnel excavated by double shield TBM based on CWFS model
In: Journal of Vibroengineering, Jg. 21 (2019-06-01), Heft 4, S. 819-832
Online
academicJournal
Zugriff:
Titel: |
Numerical analysis of hard rock tunnel excavated by double shield TBM based on CWFS model
|
---|---|
Autor/in / Beteiligte Person: | Li, Diyuan ; Sun, Jing ; Zhu, Quanqi ; Xu, Xiangyun ; Jiao, Jian |
Link: | |
Zeitschrift: | Journal of Vibroengineering, Jg. 21 (2019-06-01), Heft 4, S. 819-832 |
Veröffentlichung: | 2019 |
Medientyp: | academicJournal |
ISSN: | 1392-8716 (print) |
DOI: | 10.21595/jve.2018.19884 |
Sonstiges: |
|