Operation of Gods cum passenger lift (capacity 2 Ton ) installed in boiler side of 5X200MW BTPS and VIP lift installed in TG hall
In: Mena Report, 2023-10-12
Online
Zeitungsartikel
Zugriff:
Titel: |
Operation of Gods cum passenger lift (capacity 2 Ton ) installed in boiler side of 5X200MW BTPS and VIP lift installed in TG hall
|
---|---|
Link: | |
Zeitschrift: | Mena Report, 2023-10-12 |
Veröffentlichung: | 2023 |
Medientyp: | Zeitungsartikel |
ISSN: | 2219-0112 (print) |
Sonstiges: |
|