Design And Build Two Nos Sewage Treatment Plant Of Installed Capacity 2.5 Mld On River Harbora And 4.5 Mld On Belwa-sathi Canal Alongwith All Appurtenant Structures And Allied Works Controlled With Scada (ii) Survey, Review The Designs, Redesign Where Nec.
In: Mena Report, 2023-10-30
Online
Zeitungsartikel
Zugriff:
Titel: |
Design And Build Two Nos Sewage Treatment Plant Of Installed Capacity 2.5 Mld On River Harbora And 4.5 Mld On Belwa-sathi Canal Alongwith All Appurtenant Structures And Allied Works Controlled With Scada (ii) Survey, Review The Designs, Redesign Where Nec.
|
---|---|
Link: | |
Zeitschrift: | Mena Report, 2023-10-30 |
Veröffentlichung: | 2023 |
Medientyp: | Zeitungsartikel |
ISSN: | 2219-0112 (print) |
Sonstiges: |
|